Wednesday 3 February 2016

production schedule

This is a production schedule of what will take place including locations, props and costumes needed as well as what actors or actresses we need. We decided to divide each aspects into separate elements to make it easy and clear for the cast and for us to see what is needed for each day. Overall, we have displayed this through a table on a word document. before each day filming day this will be checked to ensure we are prepared with the correct equipment. This table collaborates all elements like props and costume into on table, one area for us to look at rather than flicking through pages of research. This table will make each filming day run as smooth as possible.


The table devised for the cast as well as the director and myself, the assistant to the director as well as having control of what goes on within the scene and what shall be in the scenes during the filming process.

No comments:

Post a Comment